Downloads
Click to download our latest company and product information.
POWER RELIABILITY FOR CAIRO AIRPORT CONTROL TOWER
Cairo International Airport is one of the busiest aviation hubs in Africa and the Middle East. With as many as 682 flights in a single day, the airport relies on highly reliable, uninterrupted power for its critical operations. At the very heart of these operations...
WHY USE A LOAD BANK?
Load banks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
The load banks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.

















