View Our Load Bank Range And Services At A Glance
Resistive Only Load Bank

When used as a controlled system test, the load simulates real-life resistive loads, such as incandescent lighting and heating loads as well as the resistive or unity power factor component of magnetic (motors, transformers).
Resistive only load banks are available from 10kW to 6000kW.
Medium Voltage Load Bank

DC Load Bank

Aviation Ground Power

Our aviation load banks are available as resistive-only, or resistive-reactive, both with DC capability, all at 400Hz
Services & Spares

Our service contracts help keep your Crestchic load bank in peak condition with regular maintenance and software upgrade visits scheduled at your convenience. Our data module calibration service ensures that the applied electrical load is accurate over a 12 month period, with traceability to UKAS laboratory standards.
Resistive-Reactive Load Bank

Resistive/reactive loads are able to simulate the operation of motor loads and electromagnetic devices within a power system. It can also provide purely resistive loads. Available from 50kVA to 6250kVA.
Transformer Packages

Load Bank Control Systems

From a basic manual controller to the portable ruggedized tablet control system, the load banks feature a microprocessor control that allows accurate adding of loads during the testing phase.
Load Bank Rental Services

Load Bank Rental Equipment

Call us today on +65 62653323

About Us & Why We are
The Best For the Job
Founded in 1983, Crestchic is one of the world’s leading specialist manufacturers of load banks which are used in the testing of power supplies in the most demanding climactic and environmental conditions across seven continents. Operating from locations in the UK, North America, China, Singapore, France, Germany and UAE, the company is at the forefront of innovation and design, with thriving sales and rental operations and a loyal and growing customer base worldwide.

Latest Load Bank News
Crestchic Unveils 600kW Liquid Cooled Loadbank at Data Centre World, London
Setting a new standard in high-density data centre commissioning Crestchic, the world's leading provider of load bank solutions, today announced the launch of its innovative 600kW Liquid Cooled Loadbank at Data Centre World, London. The product marks a significant...
Data centres, load testing, and power resilience in 2026
Backup power systems have long been essential for data centre operators striving to meet uptime targets. As demand for AI grows, grid infrastructure ages, and outages become more likely, the reliability of backup systems is increasingly seen as a strategic priority...
POWER RELIABILITY FOR CAIRO AIRPORT CONTROL TOWER
Cairo International Airport is one of the busiest aviation hubs in Africa and the Middle East. With as many as 682 flights in a single day, the airport relies on highly reliable, uninterrupted power for its critical operations. At the very heart of these operations...
Storm Goretti highlights the need for robust backup power
Crestchic Loadbanks is urging businesses across the UK to review their power-continuity plans as Storm Goretti brings heavy snowfall, strong winds and electricity disruptions nationwide. The Met Office has warned that 73 areas across the UK are at risk of power cuts...
Crestchic Completes Major Load Testing Project in Saudi Arabia
Crestchic has completed load testing for a major data centre project in Saudi Arabia. The testing was carried out using Crestchic rack-mounted load banks for both Level 4 (L4) and Level 5 (L5) testing within the data halls. A total of 1,550 rack-mounted load banks...
Crestchic celebrates double win at the 2025 AMPS Awards for Excellence
Crestchic Loadbanks is proud to have received two prestigious awards at this year’s AMPS Awards for Excellence. The annual event, held on 19th November at The Lowry Hotel in Salford. brought together colleagues from across the power industry to celebrate achievement,...
Crestchic to Exhibit at DataCentres Ireland 2025
Crestchic Loadbanks will be exhibiting at DataCentres Ireland 2025, taking place on 19–20 November at the RDS, Dublin. Now in its 15th year, the event is recognised as the country’s leading forum for the data centre community, bringing together operators, developers,...
Crestchic: Proud sponsor of the 2025 AMPS Awards for Excellence
Crestchic Loadbanks is delighted to confirm its sponsorship of the Project of the Year Award at the 2025 AMPS Awards for Excellence. Organised by the Association of Manufacturers and Suppliers of Power Generating Systems (AMPS), the event celebrates outstanding...
Powering the future: key takeaways from Data Centre World Singapore
Last week, we attended Data Centre World (DCW) Singapore. As well as allowing us to meet with customers and prospects, the event brought together industry leaders, operators, and vendors to shine a spotlight on one of the industry’s most critical and evolving...

Testimonials
British Antarctic Survey (BAS) has recently installed a second Crestchic load bank to safeguard critical data and the livelihood of scientists at two of its primary research stations, one of which is credited for the discovery of the ozone hole in 1985.
“Crestchic was the ideal provider for us as it enabled us to design exactly what we wanted at the same time as remaining cost efficient. We were provided with such a good service and robust product in the first instance that we returned to Crestchic for our most recent installation at the Rothera station. You can’t survive here without resilient generators and we can’t afford to lose the power so the load banks are critical for our operation out in Antarctica.”

Loadbanks in the Arctic
42